Category | : | Commercial |
---|---|---|
Name of the Project | : | RMZ Millenia Park |
Project Location | : | OMR @ Chennai |
Name of the Client | : | RMZ Group |
Name of the Architect | : | Innotech Engineering Consult Private Limited |
Name of The PMC | : | Inhouse |
Nature of Work | : | MS Staircaseand RCC Flooring in MLCP |
Major Item of works | : | Flooring 12,000 Sqm & Structural steel 60 MT |
Project Duration | : | 3 Months |
Category | : | Commercial |
---|---|---|
Name of the Project | : | Hiranandhani Park @ Thaiyur |
Project Location | : | OMR @ Chennai |
Name of the Client | : | Hiranandhani Group |
Name of the Architect | : | Eskay Design |
Name of The PMC | : | Inhous |
Nature of Work | : | External Development and Boundry Wall |
Major Item of works | : | Soil Filling, RR Masonary and Soild Block wall Compound wall |
Project Duration | : | 3 Months |
Category | : | Industrial |
---|---|---|
Name of the Project | : | Tata Blue scope Steel Pvt Ltd |
Project Location | : | Oragadam, Chennai |
Name of the Client | : | Tata Blue scope Steel Pvt Ltd |
Name of the Architect | : | Aswthanarayana & Eswara |
Name of The PMC | : | Aswthanarayana & Eswara |
Nature of Work | : | Expansion of Header Bay – 50,000 sqft |
Major Item of works | : | RCC and FM2 Flooring and Finishes |
Project Duration | : | 3 Months |
Category | : | Industrial |
---|---|---|
Name of the Project | : | TPI Composite @ Aarush Logistics Park |
Project Location | : | Oragadam @ Chennai |
Name of the Client | : | Ascendas Aarush |
Name of the Architect | : | ARCH Project Consultants Pvt Ltd |
Name of The PMC | : | Jones Lang Lasalle |
Nature of Work | : | Internal Partions walls and Heavy duty MS Gratings |
Major Item of works | : | 2500 Sqm of Block wall and 210 MT of Structural steel |
Project Duration | : | 2 Months |
Category | : | Industrial |
---|---|---|
Name of the Project | : | AARUSH Logistics park Pvt Ltd |
Project Location | : | Oragadam @ Chennai |
Name of the Client | : | Ascendas Aarush |
Name of the Architect | : | ARCH Project Consultants Pvt Ltd |
Name of The PMC | : | Jones Lang Lasalle |
Nature of Work | : | Trim booth, Waste Storage, Hazardus Storage – 45,000 Sqft |
Major Item of works | : | 600mm Dia Piling, Footing, RCc Pedestal and GSB and FM2 Flooring and Block wall Height of 7M |
Project Duration | : | 2 Months |
Category | : | Industrial |
---|---|---|
Name of the Project | : | AARUSH Logistics park Pvt Ltd |
Project Location | : | Oragadam @ Chennai |
Name of the Client | : | Ascendas Aarush |
Name of the Architect | : | ARCH Project Consultants Pvt Ltd |
Name of The PMC | : | Jones Lang Lasalle |
Nature of Work | : | RE Wall, RR Masonary Drain & Cutting & Filling |
Major Item of works | : | RCC 2000 Cum, RR Masonary 3000 Cum, Cutting and Filling of Earth 50,000 Cum |
Project Duration | : | 3 Months |
Category | : | Industrial |
---|---|---|
Name of the Project | : | AARUSH Logistics park Pvt Ltd |
Project Location | : | Oragadam @ Chennai |
Name of the Client | : | Ascendas Aarush |
Name of the Architect | : | PTK Architects |
Name of The PMC | : | CBRE South Asia Pvt Ltd |
Nature of Work | : | External Raod, Drain, Compund wall & Marketing Office |
Major Item of works | : | RCC 5000Cum, Block work 5000Sqm & Buildings |
Project Duration | : | 3.5 Months |
Category | : | Industrial |
---|---|---|
Name of the Project | : | AARUSH Logistics park Pvt Ltd |
Project Location | : | Oragadam @ Chennai |
Name of the Client | : | AARUSH Logistics park |
Name of the Architect | : | ARCH Project Consultants Pvt Ltd |
Name of The PMC | : | Jones Lang Lasalle |
Nature of Work | : | Spine BT Road, RCC Drain, Stone Pitching, RCC Culvert,etc |
Major Item of works | : | RCC 4000 Cum, GSB 5,000, BT 20,000Sqm, Hill earth 8000 Cum, Stone Pitching 6000 Sqm |
Project Duration | : | 4 Months |
Category | : | Industrial & Ware house |
---|---|---|
Name of the Project | : | P N Writer – 7 |
Project Location | : | Panapakkam @ Chennai |
Name of the Client | : | Vinplex India Pvt Ltd |
Name of the Architect | : | C R Narayana Rao Architects |
Name of The PMC | : | Inhouse |
Nature of Work | : | Major Item of works : RCC 5000Cum, Soil Filling – 25,000Cum & FM2 Flooring – 80,000 Sqft |
Project Duration | : | 4.5 Months |